AS 600

The winding material is pushed onto a ball-bearing central shaft. To do this, note the following points: The central shaft is completely removed from the bearings and the cone opposite the braking system is pulled off (loosen the screw first). The coil and the cone are then pushed on. The central shaft is placed in the two lower bearing shells. The bearing flaps are then closed and the cone screw is tightened again. Parts at risk of corrosion are galvanized in order to achieve the longest possible service life, even under the most difficult operating conditions..

Formular

    Attachment

    Please note the following points when ordering spare parts:

    • Specification of the machine type and machine number
    • The part number and designation of the spare part must be taken from the enclosed spare parts list or the items and must be stated in full.

    Fields marked with * are mandatory fields